Murray 2 Power Station


Client
Snowy Hydro
Duration
Jan 2019 - Nov 2021
Location
Khancoban, New South Wales, Australia
Value
$7.4 million
4

Built on the success of Murray 1, this follow-on contract saw PHE Group deliver another milestone upgrade for Snowy Hydro – renewing the control systems of four 100MW generators to strengthen energy reliability, futureproof renewable output, and sustain one of Australia’s most iconic power stations.

Murray 2 Power Station formed part of Snowy Hydro’s long-term asset life extension strategy and required extensive interface planning, environmental preparation, and flexible delivery to meet outage windows. The work built on a long-running relationship between PHE and Snowy Hydro, combining internal continuity with regional capability to deliver in a highly regulated and remote environment.

Winter conditions – icy roads, sub-zero temperatures, and reduced visibility – were addressed through pre-winter scheduling, snow-specific inductions and cold climate PPE. Routine across our Snowy portfolio, these measures helped reduce risk and maintain project continuity.

Photography courtesy of Russel Street.

Project Scope

  • Full replacement of control, protection, and excitation systems across four 100MW hydro units.
  • Upgrade and calibration of all electrical and instrumentation (E&I) equipment to support operational integration.
  • Environmental compliance, winter mobilisation, and safety management in alpine conditions.
  • Installation of stainless steel impulse lines, new field instrumentation, and automation hardware.
  • Removal and disposal of legacy cabling, infrastructure, and redundant equipment.
  • Workforce planning and sequencing to support local employment and PHE’s upskilling strategy.