Snowy 2.0 Polo Flat Precast Yard

Client
Future Generation Joint Venture (FGJV)
Duration
Feb 2021 - Jul 2021
Location
Polo Flat, Cooma, New South Wales, Australia
Value
$1.2 million
hero

Essential electrical works to energise Australia’s largest tunnel segment precast facility – enabling continuous delivery of tunnel linings for the Snowy 2.0 mega project.

As part of Snowy 2.0’s enabling infrastructure, a purpose-built precast yard was established at Polo Flat, Cooma to manufacture the concrete tunnel lining segments required for the 27 kilometres of underground works. The facility is designed to produce more than 130,000 concrete segments over the life of the project.

PHE Group was engaged by the FGJV to deliver full electrical and instrumentation services across the yard. This included power and lighting systems for critical plant, support infrastructure, and production assets – all completed within a compressed delivery timeframe to align with tunnel boring machine (TBM) mobilisation.

Aerial image courtesy of Symal.

Project Scope

  • Installation and commissioning of yard lighting poles.
  • Generator pad and main distribution board installation and commissioning.
  • Electrical and instrumentation (E&I) installation for the precast carousel production line.
  • Electrical and lighting systems for site offices, laboratory, workshop, and diesel station.
  • E&I installation and commissioning for the concrete batch plant.

Innovations and Solutions

  • Coordination with multiple stakeholders to deliver services within a constrained footprint.
  • Strong communication with FGJV to ensure integration across utilities and industrial process equipment.
  • Sitewide delivery model prioritised safety, sequencing, and access efficiency.

Outcomes and Benefits

  • Enabled operation of the Polo Flat facility supporting production of 130,000+ tunnel segments.
  • Demonstrated PHE’s capability in delivering electrical infrastructure for high-volume, industrial facilities.
  • Supported local economic activity through procurement of uniforms, accommodation, and hospitality services in the region.
  • Delivered with zero lost-time injuries across the duration of works.
  • Strengthened partnership with FGJV and contributed to milestone delivery on one of Australia’s largest energy projects.
  • Delivered driver awareness training to address the challenges of alpine road conditions and ensure safe navigation through snow-affected environments.
Project Images