The Fairview 4 NSU-3 and Fairview 5 NSU-5 Upgrades form part of Santos’ broader strategy to enhance upstream gas compression and improve long-term production efficiency across the Surat Basin. Located at separate hubs, each upgrade plays a critical role in sustaining pressure and flow through the GLNG export pipeline.
PHE delivered the full electrical and instrumentation (E&I) scope for both projects under separate contracts. NSU-3 was successfully completed in 2024; NSU-5 commenced in 2025 as a follow-on engagement. Both works were delivered in brownfield environments with live infrastructure, staged shutdowns, and strict compliance requirements.