Long-term partner to one of Australia’s most iconic breweries – supporting Lion XXXX with critical upgrades to production control systems and infrastructure, all delivered safely within an operational facility.

Few brands are more deeply woven into Queensland’s cultural identity than XXXX. Brewed in Milton since 1878, the XXXX Brewery is an iconic Brisbane landmark. As part of Lion’s continued investment in the site, key infrastructure systems are being progressively upgraded to ensure production resilience and operational efficiency well into the future.

PHE Group has delivered multiple electrical packages across the brewery over the years. The following case study highlights two recent engagements that reflect the complexity, coordination, and capability required to work safely within this live operational environment.

Images courtesy of Lion XXXX.

Project Scope

Stream 3 PCL Migration

  • Installation of 200m of fibre and PROFINET cabling to create a new ring network
  • Replacement of legacy PLCs with Siemens ET200SP and S7‑1500 units
  • Re-termination of I/O cabling, and installation of switches and gateways        
  • Delivery within a live, operational brewery environment        
  • Cable labelling and independent certification       
  • Project value: $47 thousand

Wastewater Treatment Plant Uplift

  • Rewiring and installation of new cabinets, switchboards, and elevated infrastructure        
  • Installation of cable trays and I/O connections across flood-resilient mezzanine
  • Integration of Siemens S7‑1500F PLC system (DI, DO, AI modules)        
  • Waterproofing of critical cabling with submarine joins
  • Electrical testing, QA, and documentation       
  • Project value: $208 thousand

Outcomes and Benefits

  • Staged upgrades without disruption, including coordination of works around production and transport schedules.
  • Demonstrated certified fibre capability in a specialised, niche field.
  • Increased flood resilience through elevated infrastructure and waterproofed cabling.
  • Replaced legacy PLCs with Siemens systems to streamline future integration.
  • These works highlight PHE's proven capability in brewery environments – maintaining production continuity and adapting to infrastructure challenges without disrupting operations.