PHE Group was engaged to deliver the full electrical installation for the 20MW gas and diesel-fired power station forming part of the Agnew Hybrid Renewable Project – the first remote mining operation in Australia to utilise a hybrid modality, integrating gas, diesel, wind, solar, and battery storage assets. Delivered for Cummins under the broader Agnew Hybrid Renewable scope, the power station provides reliable, low-emission energy to the Gold Fields Agnew Gold Mine.
The works required careful planning and execution in a remote location, integrating with renewable generation systems and accommodating the complex logistics of transporting materials, equipment and personnel to site.