01 Jun Qld Laminex Sutdown
Laminex shut down consisted of an upgrade to the Contiroll Press. Works included replacement of the old DC drives with AC drives. New MCC installation, power and instrumentation cabling / terminations, installation of new fire suppression system, QA and commissioning support.
Works were completed on time and ahead of the proposed time set for the electrical works. A major millstone was the project was completed with Zero incidents and injuries.
Thank you to support from the Tumut branch for the additional labour (Big red and Jack) and to the Gympie, Brisbane workshop team for their commitment to safety and a job well done.