Major Projects

The following is a comprehensive list of major electrical contracts and
their value carried out by PHE Pty Ltd from 2014 to the present time.

In addition to these projects, minor installation works have been carried out in the Tumut, Wagga Wagga, Oberon, Brisbane, and Gympie areas and are too numerous to mention.

Lion Brewery – Milton QLD

  • Preventative Maintenance
  • Installation Projects

The Laminex Group – Gympie

  • Preventative Maintenance
  • Installation Projects

Visy Industries Tumut Pulp & Paper Mill

  • Electrical and Instrumentation maintenance
    management & control.
  • Installation Projects
    Snowy Hydro Power Stations Upgrade
  • Electrical and Instrumentation maintenance
    management & control.
  • Installation Projects

Cadia Valley Operations Orange Newcrest Mining Ltd

  • Electrical and Instrumentation maintenance
    management & control.
  • Installation Projects
  • Underground installation and maintenance

Oz Minerals – Carrapateena

  • E&I Installation Projects

Agnew Power Station Project- 9th Generator

Location: Leinster, WA
Client: Cummins
Project Scope: Electrical installation of a 1x gas engine
Contract Value: $300K

  • Installation of cable supports
  • Installation of MV cable termination and testing
  • HV &LV substation control wiring
  • Low voltage, control and communication cabling
  • Removal of redundant cables and cable trays.
  • Installation of earthing
  • Installation & termination of Hazardous area equipment
  • Stage 1 and Stage 2 pre-commissioning

Stage 1 & 2 Green Dry Mill Upgrade

Location: Tuan (via Maryborough), QLD
Client: Altus Renewables
Duration: 4 months
Contract Value: $450K

  • Design, supply and installation of LV and control cabling
  • Build and Install Main LV Switchboard extensions and upgrades
  • Supply and install new Distribution boards
  • Supply and install cable path and support (cable ladders, trays, etc.)
  • Supply and installation of all LV and control/instrumentation cabling
  • Supplied and installed marshalling panels
  • Removal of existing redundant cabling
  • Supply and installation of general light and power
  • Stage1 and stage 2 pre-commissioning
  • Stage 3 commissioning support.

Carrapateena Underground Infrastructure Project

Location: Pernatty, SA
Client: OZ Minerals
Project Scope: E&I installation of underground and surface infrastructure including commissioning of a new green field mine site
Duration: 11 months
Contract Value: $17M

  • E&I installation of a 3000T/hr ThyssenKrupp KB 54-67 Gyrator Crusher
  • E&I installation of 3000mts of associated underground materials handling conveyors
  • Installation of 7000mts of 11kV underground HV reticulation system
  • E&I installation of 3 x surface ventilation systems consisting of 2 x 1.75MW fans in each system
  • Design, supply and installation of LV and control cabling
  • Install Main LV & HV Switchboards
  • Supply and install new Distribution boards
  • Supply and install cable path and support (cable ladders, trays, etc.)
  • Supply and installation of all LV and control/Instrumentation cabling
  • Supplied and installed remote I/O enclosures
  • Supply and installation of general light and power
  • Stage1 and stage 2 pre-commissioning
  • Stage 3 commissioning support.

Agnew Power Station Project

Location: Leinster, WA
Client: Cummins
Project Scope: Electrical installation of a 10 Engines 16MW Gas and Diesel fired power station
Duration: 4 months
Contract Value: $2.7M+

  • Connection of the 8 gas fired C2000N5C 11kV generators and 2 x diesel 11kV generators C2250D5 1.8MW
  • Remote radiators
  • HV /LV switch rooms
  • Cable trays and ladders
  • MV, LV, DC, Control, Instrumentation, Communication cabling & terminations
  • Earthing / Auxiliary transformers
  • Air compressors
  • Lube oil/waste pumps
  • Hazardous area
  • General lighting & power
  • Earthing & Lightning protection systems
  • UPS power supplies
  • QA and stage 1 & 2 commissioning
  • Additional 4 x 1250KVA diesel generators, Kiosk & 11KV RMU
  • Stage 1 and Stage 2 commissioning

Power Station – Standby Power station

Location: Brisbane West, QLD
Client: M|Power
Project scope: Electrical installation of 3 x Black Start Generators, RMU and NER
Duration: 2 months
Contract Value: $340K

  • Installation of Generator HV cabling and termination
  • LV and Control Wiring
  • Earthing
  • Installation of 11KV ABB RMU, NER and VT Enclosure
  • Installation on 11KV Feeder
  • ABB HV Protection Relay Programming & Testing
  • Stage 1 and Stage 2 commissioning
  • Stage 3 commissioning assistance

Wilga Park Power station Expansion

Client: Clarke Energy
Duration: 1.5 months
Contract Value: $350K

  • Cable ladder, support & earthing
  • Generator enclosure light and power
  • PLC control panel Modifications
  • Installation of HV and LV cables
  • Installation of control panels, cabling and terminations to radiator fans
  • Hazardous area
  • Shutdown works
  • Stage 1 and Stage 2 commissioning
  • Stage 3 commissioning assistance

Laminex Industries

Location: Gympie, QLD
Project scope: Site energy efficiency-LED lighting upgrade
Contract Value: $165K

Gympie Building Company

Location: Wide Bay, QLD
Project Scope: Dept of Defence Training Area – Camp Kerr sheds
Contract Value: >$35k

  • General light and power installation
  • Underground conduit installation

Powertech Services

Location: QGC
Contract Value: Ongoing

  • HV Jointing, 11KV, 33KV

CON 1 T3 HYDROFLOAT PROJECT

Location: Orange, NSW
Client: Newcrest
Project Scope: E&I Subcontract for the supply and installation of HV & LV services for FCS
Contract Value: $2.2M

  • Installation of Cross Flow Classifiers, Concentrate Screen & HydroFloat separators, Cyclone Cluster, Davit Crane and associated hoppers, pumps, pipework in the new T3 HydroFloat building
  • Supply and installation of instrumentation
  • Installation of cable support systems
  • Low Voltage cabling
  • Installation and termination of general light and power
  • Installation and termination of fibre optic cabling systems
  • MCC modifications, installations and terminations
  • Stage 1 and 2 commissioning
  • Stage 3 commissioning support

Gruyere Gold Mine Power Station – Western Australia

Location: Laverton, WA
Client: Clarke Energy
Project Scope: Electrical Installation of 11-Engine 40MW power station
Contract Value: $3.2M

  • Installation of cable support
  • Installation of LV MCC and PLC cabinet into Main Switchroom
  • Installation of UPS and 48VDC system
  • Low voltage and control cabling
  • HV cable installation & termination
  • HV tie-in into HV Switchroom suppling the gas compressor station
  • Installation, termination, and inspection of Hazardous area equipment
  • Stage 1 and stage 2 commissioning
  • Assistance with stage 3 commissioning

Murray 1 Power Station Units 1&2 Technology Upgrade

Location: Snowy Mountains, NSW
Client: Snowy Hydro
Project Scope: Technology upgrade to the Snowy Hydro electrical control systems
Duration: 5 months
Contract Value: $1.59M

  • Generators U01 & U02 upgrade
  • Group 1/2 330KV Transformers upgrade
  • Removal of redundant equipment
  • Installation of new protection & control cubicles
  • Installation of cable support infrastructure
  • LV cabling installations and termination
  • Testing, calibration, and installation of instruments
  • Installation and cabling of generator excitation system
  • Installation of light & power
  • Commissioning

Murray 1 Power Station Units 3&4 Technology Upgrade

Location: Snowy Mountains, NSW
Client: Snowy Hydro
Project Scope: Technology upgrade to the Snowy Hydro electrical control systems
Duration: 5 months
Contract Value: $1.6M

  • Generators U03 & U04 upgrade
  • Group 3/4 330KV transformers upgrade
  • Removal of redundant equipment
  • Installation of new protection & control cubicles
  • Installation of cable support infrastructure
  • LV cabling installations and termination
  • Testing, calibration, and installation of instruments
  • Installation and cabling of generator excitation system
  • Installation of light & power
  • Commissioning

Lake Vermont Coal Preparation Plant V3

Location: (Lake Vermont Resources) via Dysart, Qld
Client: Sedgman
Project Scope: E&I Contract for the supply and installation of HV & LV services for Theiss Services
Contract Value: $1.8M

  • Installation, termination, and commissioning of the 11kV underground reticulation system
  • 11kV / 415 RMU and transformer installations and terminations
  • Installation of cable support systems
  • Low Voltage cabling
  • Installation and termination of general light and power
  • Installation and termination of fibre optic cabling systems
  • MCC installations and terminations
  • Commissioning assistance

Tarong Tailings Dewatering Project

Location: Kingaroy, Qld
Client: Sedgman
Project Scope: E&I Contract for the supply and installation of HV & LV services for Stanwell Corporation Ltd
Contract Value: $700K

  • Installation, termination, and commissioning of the 11kV underground reticulation system
  • 11kV / 415 RMU and transformer installations and terminations
  • Installation of cable support systems
  • Low Voltage cabling
  • Installation and termination of general light and power
  • Installation and termination of fibre optic cabling systems
  • MCC installations and terminations
  • Commissioning assistance

Enhanced Recovery of Aroma (ERA) Project

Location: Gympie, Qld
Client: Nestle
Project Scope: E&I Contract for the supply and installation of LV services
Contract Value: $160K

  • Installation of Cable Ladder and Basket in a multi-level building
  • Installation, termination, and QA testing of 415Vac Submains and subcircuits
  • Vendor MCC’s and equipment installation
  • Testing and commissioning

Grosvenor – Stage 2

Client: Clarke Energy
Project Scope: Electrical Installation of 5-Engine 16.5MW power station
Contract Value: $870K

  • Installation of cable support
  • Installation of LV MCC and PLC cabinet into Main Switchroom
  • Installation of UPS and 48VDC system
  • Low voltage and control cabling
  • HV cable installation & termination
  • HV tie-in into HV Switchroom suppling the gas compressor station
  • Installation, termination, and inspection of Hazardous area equipment
  • Stage 1 and stage 2 commissioning
  • Assistance with stage 3 commissioning

Daly River Solar Farm

Location: Daley River, NT
Client: BMD
Project Scope: Electrical Installation of 1MW power station
Contract Value: $300K

  • 1MWp ground mounted solar farm connected to the Power and Water Company (PWC) network in Daly River, Northern Territory
  • Supply, installation, testing and commissioning of a ground-mounted grid connected photovoltaic system
  • LV power cable installation
  • Installation of all electrical panels and equipment: LV Switchboard, Marshalling boards, Inverters, and local isolators
  • To terminate, test and commission cables at the LV switchboard, PCC, Marshalling boards and inverters
  • Install, terminate string cables of communication Fibre and Cat6 cables, test and commissioning.
  • Earthing and lightning protection
  • QA documentation, construction and commissioning documentation, and input requirements for Handover MDR and Operation and Maintenance.

Blayney Sealink Project

Location: Blayney, NSW
Client: Jord International & Newcrest Mining
Project Scope: Supply and Installation of Electrical & Instrumentation
Contract Value: $1.1M

  • Installation of cable support systems
  • Small power and lighting installation
  • Low Voltage cabling
  • Instrumentation supply and installation
  • Commissioning support

Keg Line Safety Upgrade

Location: Milton, QLD
Client: Lion XXXX Brewery
Project Scope: Supply and Installation of Electrical & Instrumentation
Contract Value: $300K

  • Installation of safety gate switches and light curtains
  • Modifications to existing MCC and PLC cabinets
  • Supply and installation of remote I/O panels
  • Supply and installation of local control stations
  • Low Voltage cable installation and termination
  • Commissioning support

Earth Grid Installation

Location: Kemps Creek, NSW
Client: Bussola
Project Scope: Supply and Installation of Electrical Earth Grid
Contract Value: $250K

  • Installation of bare earth cable
  • Erico CAD weld joints
  • Quality Assurance testing
  • Commissioning

Diamantina Blackstart Generator

Location: Mt Isa, QLD
Client: Clarke Energy
Project Scope: HV and LV Installation of Blackstart Generator Diamantina Power Station
Contract Value: $200K

  • HV Cable installation and termination
  • HV Tie-in to existing substation
  • LV power and control cable installation and terminations
  • Commissioning

Showgrounds Power Upgrades

Location: Gympie, QLD
Client: Gympie Regional Council
Project Scope: Supply and Installation of Electrical Switchboards
Contract Value: $150K

  • Supply and Installation of one (1) S/S 2000A Main switchboard
  • LV Cable terminations to existing 1000kVA transformer
  • Supply and Installation of new underground submains
  • Supply and Installation of 10 x S/S Consumer panels to Side Show Alley

Engine Power Station

Location: Kemps Creek, NSW
Client: Clarke Energy
Project Scope: Electrical Installation of 2-Engine power station
Contract Value: $300K

  • HV Cable installation and termination
  • HV Tie-in to RMU
  • LV power and control cable installation and terminations
  • Commissioning

5-Engine power station

Location: Oaky Creek, QLD
Client: Clarke Energy
Project Scope: Electrical Installation of 5-Engine power station
Contract Value: $1M

  • HV Cable installation and termination
  • Installation of MCC and station control room termination of auxiliary power
  • HV Tie-in to Overhead power lines
  • LV power and control cable installation and terminations
  • Commissioning

Australian Civil & Structure – Grosvenor power generation Earth Grid

Client: Clarke Energy
Project Scope: Supply and Installation of Electrical Earth Grid for 7 x 3.3MW Gas Generators
Contract Value: $180K

  • Installation of bare earth cable
  • Erico CAD weld joints
  • Quality Assurance testing
  • Commissioning

Grosvenor – Stage 1

Client: Clarke Energy
Project Scope: Electrical Installation of 7-Engine 23MW power station
Contract Value: $1.2M

  • Installation of cable support
  • Installation of LV MCC and PLC cabinet into Main Switchroom
  • Installation of UPS and 48VDC system
  • Low voltage and control cabling
  • HV cable installation & termination
  • HV tie-in into HV Switchroom suppling the gas compressor station
  • Installation, termination, and inspection of Hazardous area equipment
  • Stage 1 and stage 2 commissioning
  • Assistance with stage 3 commissioning

Disconnection of Reedy Creek 2 Power Station

Location: Reedy Creek, QLD
Client: Clarke Energy
Project Scope: Decommissioning of 10-Engine 33MW power station
Contract Value: $220K

  • Disconnected of HV, LV and control termination
  • Reclaimed all usable HV, LV and control cables
  • Reclaim all cable support structure
  • Prepare Generator enclosure, Switchroom, HV switchgear for transportation

Cadia East Underground Panel Cave 2 East Crusher

Location: Cadia, NSW
Client: Newcrest Mining
Project Scope: Supply and Installation of underground Electrical services for the East Crusher
Contract Value: $13.4M

  • Installation of cable support systems
  • 33kv High Voltage switch gear
  • 33kv / 11kv High Voltage reticulation cabling and terminations
  • Low Voltage cabling
  • Installation and termination of general light and power
  • Installation of fibre optic system
  • MCC installations and terminations
  • 33kv / 11kv / 415 transformer installations and terminations
  • AutoCAD Design and drawings mark up

Baralaba Coal Expansion Project

Location: Baralaba, QLD
Client: Sedgman
Project Scope: E&I Contract for the supply and installation of HV & LV services for Cockatoo Coal Train Loadout facility
Contract Value: $4M

  • Installation, termination, and commissioning of the 22kV Underground reticulation system
  • 22kV / 415 RMU and transformer installations and terminations
  • Installation of cable support systems
  • Low Voltage cabling
  • Hazardous Area (Gas & Dust) instrument supply and installation
  • Installation and termination of general light and power
  • Installation and termination of fibre optic cabling systems
  • MCC installations and terminations
  • Commissioning assistance

Cadia Low Grade Concentrator Fluorine Removal

Location: Cadia, NSW
Client: Newcrest Mining
Project Scope: Supply and Installation of Surface Electrical services for the Fluorine Removal Project
Contract Value: $1.0M

  • Installation of cable support systems
  • 3kv High Voltage switch gear
  • 3kv High Voltage reticulation cabling and terminations
  • High and Low Voltage cabling
  • Installation and termination of general light and power
  • MCC installations and terminations
  • Stage 1 and Stage 2 Commissioning

Oaky Creek power generation Earth Grid

Location: Oaky Creek, QLD
Client: Bussola
Project Scope: Supply and Installation of Electrical Earth Grid for 5 x 3.3MW Gas Generators
Contract Value: $110K

  • Installation of bare earth cable
  • Erico CAD weld joints
  • Quality Assurance testing
  • Commissioning

Disconnection of Eurombah Power Station

Location: Eurombah, QLD
Client: Clarke Energy
Project Scope: Decommissioning of 9-Engine 30MW power station
Contract Value: $105K

  • Disconnected of HV, LV and control termination
  • Reclaimed all usable HV, LV and control cables
  • Reclaim all cable support structure
  • Prepare Generator enclosure, Switchroom, HV switchgear for transportation

Disconnection of Reedy Creek Power Station

Location: Reedy Creek, QLD
Client: Clarke Energy
Project Scope: Decommissioning of 10-Engine 33MW power station
Contract Value: $105K

  • Disconnected of HV, LV and control termination
  • Reclaimed all usable HV, LV and control cables
  • Reclaim all cable support structure
  • Prepare Generator enclosure, Switchroom, HV switchgear for transportation

Spring Gully Water Transfer Station Project

Location: Spring Gully, QLD
Client: York Civil (Subcontract) Origin Energy
Project Scope: Supply and Installation of Electrical services for the WTP Feed dam Upgrade
Contract Value: $600K

  • Installation of 315kVA 11KV kiosk transformer
  • Earth grid
  • Underground conduit/cable installation for HV, LV and Fibre Optics
  • Installation of transfer pumps and local control isolators
  • Manufacture and installation of marshalling and light & power panels
  • Installation of Motor Control switchboard
  • HV auditing and certifications
  • General Dam Light & Power Installation

Centennial Coal Springvale CPP Upgrade

Location: Springvale, NSW
Client: Sedgman
Project Scope: Electrical and Instrumentation installation of the Springvale coal preparation plant to increase throughput to 450 t/h
Contract Value: $700K

  • De-commissioning of redundant equipment
  • Modifications to the existing MCC with the installation of new motor starting equipment
  • Installation of new PLC cabinet
  • Installation of Nema 2 cable ladder and the modification of existing cable support system
  • Installation of instrumentation
  • SWA control and power cable installation
  • Electrical installation of new Thickener tank
  • General Light & Power Installation

Boggabri Coal – Train Loadout Bin

Location: Boggabri, NSW
Client: Halley & Mellows (Subcontract) Theiss Sedgman JV
Project Scope: Electrical and Instrumentation installation of the Boggabri Coal (300t surge bin) Trai Loadout Bin
Contract Value: $500K

  • Nema 20B cable support system
  • LV cable installation and terminations
  • Manufacture and installation of marshalling panels
  • Trackside train weigh scale system installation
  • PLC cabinet and Data cabinet installation and termination
  • Indurad radar detection system installation
  • General Light & Power Installation

T1 (Tumut 1) Transformer and Line Protection Upgrades

Location: Tumut, NSW
Client: SnowyHydro
Project Scope: Technology upgrade to the Snowy Hydro electrical control systems
Contract Value: $350K

  • LV cable installation and terminations
  • Installation and termination of control panels
  • Control System commissioning

T2 (Tumut 2) Transformer and Line Protection Upgrades

Location: Tumut, NSW
Client: SnowyHydro
Project Scope: Technology upgrade to the Snowy Hydro electrical control systems
Contract Value: $630K

  • LV cable installation and terminations
  • Installation and termination of control panels
  • Control System commissioning

UTSS (Upper Tumut Switching Station)

Location: Tumut, NSW
Client: SnowyHydro
Project Scope: Auto Synchroniser Upgrade
Contract Value: $700K

  • LV cable installation and terminations
  • Installation and termination of control panels
  • Control System commissioning

T2 (Tumut 2) Power Station

Location: Tumut, NSW
Client: SnowyHydro
Project Scope: Governor Upgrades
Contract Value: $170K

  • LV cable installation and terminations
  • Installation and termination of control panels
  • Commissioning

Eurombah Creek power generation Earth Grid

Location: Eurombah Creek. QLD
Client:  Bussola
Project Scope: Supply and Installation of Electrical Earth Grid for 9 x 3.3MW Gas Generators
Contract Value: $170K

  • Installation of bare earth cable
  • Erico CAD weld joints
  • Quality Assurance testing
  • Commissioning

EDL – Moranbah North Expansion

Location: Moranbah North, QLD
Client: Clarke Energy
Project Scope: Electrical Installation of 6-Engine 20MW power station
Contract Value: $950K

  • Installation of cable support through an existing power station
  • Installation of LV MCC and tie-in to an existing MCC
  • Low voltage and control cabling
  • HV cable installation & termination
  • HV tie-in to existing HV Switchroom
  • Installation, termination, and inspection of Hazardous area equipment
  • Stage 1 and stage 2 commissioning
  • Assistance with stage 3 commissioning

Origin – Eurombah Creek Power Generation

Location: Eurombah Creek. QLD
Client: Clarke Energy
Project Scope: Electrical Installation of 9-Engine 30MW power station
Contract Value: $2M

  • Installation of cable support
  • Installation of LV MCC and PLC cabinet into Main Switchroom
  • Installation of UPS and 48VDC system
  • Low voltage and control cabling
  • HV cable installation & termination
  • HV tie-in into HV Switchroom suppling the gas compressor station
  • Installation, termination, and inspection of Hazardous area equipment
  • Stage 1 and stage 2 commissioning
  • Assistance with stage 3 commissioning

Origin – Reedy Creek 2 Power Station Earth Grid

Location: Reedy Creek, QLD
Client: Clarke Energy
Project Scope: Supply and Installation of Electrical Earth Grid for 10 x 3.3MW Gas Generators
Contract Value: $200K

  • Installation of bare earth cable
  • Erico CAD weld joints
  • Quality Assurance testing
  • Commissioning

Origin – Reedy Creek 2 Power Station

Location: Reedy Creek, QLD
Client: Clarke Energy
Project Scope: Electrical Installation of 10-Engine 33MW power station
Contract Value: $1.95K

  • Installation of cable support
  • Installation of LV MCC and PLC cabinet into Main Switchroom
  • Installation of UPS and 48VDC system
  • Low voltage and control cabling
  • HV cable installation & termination
  • HV tie-in into HV Switchroom suppling the gas compressor station
  • Installation, termination, and inspection of Hazardous area equipment
  • Stage 1 and stage 2 commissioning
  • Assistance with stage 3 commissioning