Location | Queensland Workshop |
Client | Future Generation Joint Venture – Snowy 2.0 |
Project Scope | Panel Build |
Duration | March – June 2021 |
Value Added | $1M+ |
PHE were engaged by FGJV for the design and construct of the Tunneling lighting boards to be used on the Snowy 2.0 Project.
The tunneling lights board will be used for the temporary lighting installed in the 27km of tunnels during tunnel construction works.
The boards consist of 4x transformer panels and some 90 lighting panels.