Category
Mining

Mt Pleasant Mine Infrastructure Area (MIA)

PROJECT INFO:

LocationMuswellbrook, NSW
ClientMACH Energy (Subcontracted to FCS)
Project ScopeElectrical distribution and lighting
Duration10 months
Value AddedUndisclosed

PHE Pty Ltd was awarded the electrical contract for the installation of the Mt Pleasant Mine Infrastructure Area at MACH Energy’s greenfield coal mine at Muswellbrook. The electrical works involved the supply and installation of outside area lighting on 8m tilt-poles, electrical installation and data fit out of the administration complex, supply and install cable supports, lighting and power for the light and heavy vehicle wash bays, diesel fuel farm, water treatment plant, sewage plant, Tyre Bay, MIA and CHPP Boom Gates and all electrical commissioning.

The electrical works were completed LTI free with more than 9000 hours completed on the project over 10 months.

Mach Energy and FCS representatives congratulated PHE for their contribution towards the electrical completion of the MIA. Both the Mach Energy Principle Electrical Engineer and FCS’s Company Director had a personal thanks to PHE’s commitment and special thanks to PHE’s Shane Christie- Johnston and Isaac Todman in leading the execution of these works by going above and beyond with their efforts.

RETURN TO PROJECTS PAGE