Evolution Mining’s Cracow Gold Mine (located 500km Northwest of Brisbane) engaged PHE to design and install motor starting equipment for a new 315kW Primary Fan. Rockwell Automation was selected to provide their PowerFlex 755 Frame 8 VFD and controlled by a Rockwell MicroLogix 1100¬†PLC and PanelView Plus 6 HMI. The MCC was then installed into a Pre-Fab Switchroom designed to Evolution and PHE specification.

You can see the installation of the MCC into the Pre-Fab Switchroom by going to:

YouTubeYouTube-Cracow

 

Project info
Customer Evolution Mining
Project scope Engineering and Manufacture of 315kW Primary Fan MCC
Duration 2013
Value added TBA
Category Mining, Switchboards