Boggabri Coal - Train Load Out Bin

Boggabri, NSW
  • Boggabri 1
  • Boggabri 2
  • Boggabri 3
  • Boggabri 1
  • Boggabri 2
  • Boggabri 3

PHE were engaged by HMA (Halley & Mellowes) for the Electrical & Instrumentation installation of the Boggabri Coal Expansion Project TLO (Train Load Out)

The project provides an automated coal train loading facility with a 300 tonne surge bin. Train Wagons are weighed via a trackside weigh scale and are monitored for speed and position using a radar based system and photo electric sensors.

Project scope included the installation and cabling of all instruments to junction boxes on each level of the TLO. These junction boxes are then cabled back to the control room based Rockwell ControlLogix PLC. Control is then provided to the Hydraulic system responsible for the opening and closing of the various level gates. The project also included all emergency lighting to the internals and stairways consisting of some 50 luminaires throughout the TLO.

 

 

Project info
Customer Halley & Mellowes
Project scope Electrical & Instrumentation Installation
Duration August - November 2014
Value added $500K
Category Mining